Blog

Switchboard for Government Building | 4-Jun-2021 |

Switchboard for Government Building | 4-Jun-2021 |

1200A Main LV Switchboard in production for a government building in Manchester. When complete this board will consist of five ACBs, automatic changeover controls and metering. #engineering CUBIC-Modulsystem A/S Schneider Electric #switchgear       If...

read more
AFDD Distribution Board | 16-Apr-2021 |

AFDD Distribution Board | 16-Apr-2021 |

Some pictures of a 24 Way TPN Distribution Board completed this week. This board has been fitted with surge protection, earth leakage protection to all outgoing curcuits and Schneider Arc Fault Detection Devices (AFDD).     If you require a bespoke job like...

read more
Work In Progress | 26-Mar-2021 |

Work In Progress | 26-Mar-2021 |

Work in Progress! This Form 4 Type 2 Switchboard with a 2500A ACB incomer is nearing completion. Destined for a food processing facility in Northamptonshire. #cubic #schneiderelectric #electricalengineering If you require a bespoke job like this, please do not...

read more
Generator Switchboard Form 4 Type 6 | 26-Feb-2021 |

Generator Switchboard Form 4 Type 6 | 26-Feb-2021 |

Another Form 4 Type 6 panel finished this week. These pictures show some of the metal work while in production. With @SchneiderUK changeover controls and motorized MCCBs this panel makes good use of the #Cubic Cu-flex system.   If you require a bespoke job like...

read more
Form 4 Type 6 Switchboard | 15-Jan-2021 |

Form 4 Type 6 Switchboard | 15-Jan-2021 |

Cubic Framework and copper work complete on a switchboard we took order for this week. When complete this Form 4 Type 6 Switchboard will consist of a 1600A Withdrawable ACB Incomer, 32x TP MCCBs, Metering and Class 1 Surge Protection.  The Switchboard is due to be...

read more
Switchboard for Government Building | 04-Dec-2020

Switchboard for Government Building | 04-Dec-2020

Switchboard for a government building in Liverpool city centre ready and waiting to be dispatched. This Form 4 board has been split into 3 manageable sections for shipping and will be reassembled on site. If you require a bespoke job like this, please do not hesitate...

read more