Blog
Form 4 Type 6 Switchboard for Spring Gardens, London
We are excited to share the successful completion of our latest project - a Form 4 Type 6 Switchboard for Kane Group, who are managing the Mechanical & Electrical works for the commercial redevelopment of 10 Spring Gardens, London. This week, we had the pleasure...
Northern Switchgear Ltd is proud to announce that we now stock Schneider Electric’s Isobar P Range
Northern Switchgear Ltd is proud to announce that we now stock Schneider Electric’s Isobar P Range of Distribution boards, Breakers, RCBOs, AFDDs and accessories! Designed with quality, safety, and performance in mind, the Isobar P Range offers a wide range of options...
2500a Switchboard for 500 bed Hotel | 11-Nov-2022 |
Amongst our busy workshop floor is this Form 4 type 2 Switchboard nearing completion. This U-shaped switchboard for a 500 bedroom hotel in Glasgow consists of a 2500a ACB incomer and busbar system, class 1 surge protection and 70 outgoing ways. Metalwork is...
400A Power Network Substation Switchboard
We recently completed this panel for a power network substation in Wales. This switchboard is constructed to Form 4 Type 5 and consists of two motorized 400A MCCB incomers and automatic changeover controls. @SchneiderUKI #electricalengineering #switchgear If...
2000a Switchboard
This 2000A switchboard is nearing completion. A quick turnaround was required for a customer in the UK. Here are a few images of the board in production, featuring Paul McDonnell working hard to get it ready for dispatch on Monday...
ACB Repair at a hospital in South Wales | 11-Mar-2022 |
We recently attended a Hospital in South Wales where a GE M-PACT mk2 ACB which had failed during an auto changeover left the hospital without power for a short time. We investigated the ACB on a workbench by performing electrical tests to try and simulate the fault....
Form 3B Type 2 Switchboard for a Golf Course | 4-Mar-2022
Form 3B Switchboard for a new clubhouse at a golf course in West London. Consisting of two 800a incomers complete with automatic transfer controls, metering and Class 1 surge protection. A constricted client schedule meant we had to turn this project around less than...
ACB Maintenance at a data centre in UK | 28-Jan-2022 |
During a recent visit to a data centre in the UK, we serviced and tested 35 x Terasaki AT20 ACBs. Our engineers were working on 5 x ACBs per night as part of the necessary maintenance. These services will prolong the usable life of the ACBs and reduce the risk of...
Form 4 Type 6 Switchboard | 14-Jan-2022 |
One of the Switchboards on our packed workshop floor is nearing completion. Form 4 Type 6 Switchboard complete with Class 1 Surge protection, metering and cable terminals for each MCCB. CUBIC-Modulsystem A/S metal framework and busbar connection straps....
Charitable donation in lieu of Christmas gifts | 13-Dec-2021 |
In lieu of Christmas gifts we have made a donation to OGCancerNI. OG Cancer NI is a locally based registered charity, formed specifically to benefit patients and families affected by oesophageal and gastric (stomach) cancer. The medical term for these cancers is...
Form 3 switchboard | 15-Oct-2021 |
Another switchboard nearing completion on our workshop floor. This Form 3 board is destined for Glasgow, where it will distribute power to a high rise apartment block. If you require a bespoke job like this, please do not hesitate to get in touch. Make an...
160A Automatic Changeover Switches | 24-Sep-2021 |
We recently received an order for a number of 160A automatic changeover switches fitted with a single line manual bypass. These panels are complete with mains and generator MCCBs along with terminals for the outgoing cables. #Schnieder CUBIC-Modulsystem A/S...